<?xml version="1.0" encoding="UTF-8"?>
<!DOCTYPE article PUBLIC "-//NLM//DTD JATS (Z39.96) Article Authoring DTD v1.4 20240229//EN" "JATS-articleauthoring1.dtd">
<article article-type="research-article" xml:lang="zh-CN" xmlns:xlink="http://www.w3.org/1999/xlink">
  <front>
    <journal-meta>
      <journal-id journal-id-type="publisher-id">56</journal-id>
      <journal-title-group>
        <journal-title>建筑工程前沿</journal-title>
        <abbrev-journal-title>Frontiers of Construction Engineering</abbrev-journal-title>
      </journal-title-group>
      <issn>ISSN: 3104-817X EISSN: 3104-8161</issn>
      <publisher>
        <publisher-name>睿核出版社有限公司</publisher-name>
      </publisher>
    </journal-meta>
    <article-meta>
      <article-id pub-id-type="publisher-id">15080</article-id>
      <title-group>
        <article-title>建筑工程施工进度优化与资源配置协同</article-title>
      </title-group>
      <contrib-group>
        <contrib contrib-type="author">
          <string-name>柳正国</string-name>
        </contrib>
      </contrib-group>
      <pub-date pub-type="epub">
        <year>2025</year>
        <month>11</month>
      </pub-date>
      <issue>11</issue>
      <abstract>
        <p>在建筑工程项目施工管理中，为保证施工进度和项目目标顺利实现，需对施工过程中的各项资源进行合理配置，实现对施工进
度与资源配置的协同管理。本文针对建筑工程施工进度优化与资源配置协同优化问题，分析了影响因素、优化方法和模型建立，通过模拟
仿真实现对资源配置协同优化的仿真计算。将复杂问题分解为多个相互独立的子问题，采用启发式算法、线性规划和非线性规划等方法进
行求解。将有限的资源配置到项目关键路径上，从而实现资源的动态优化配置，同时采用信息技术实现了信息在项目多个参与方间的共享，
从而提高了资源利用效率。</p>
      </abstract>