<?xml version="1.0" encoding="UTF-8"?>
<!DOCTYPE article PUBLIC "-//NLM//DTD JATS (Z39.96) Article Authoring DTD v1.4 20240229//EN" "JATS-articleauthoring1.dtd">
<article article-type="research-article" xml:lang="zh-CN" xmlns:xlink="http://www.w3.org/1999/xlink">
  <front>
    <journal-meta>
      <journal-id journal-id-type="publisher-id">56</journal-id>
      <journal-title-group>
        <journal-title>建筑工程前沿</journal-title>
        <abbrev-journal-title>Frontiers of Construction Engineering</abbrev-journal-title>
      </journal-title-group>
      <issn>ISSN: 3104-817X EISSN: 3104-8161</issn>
      <publisher>
        <publisher-name>睿核出版社有限公司</publisher-name>
      </publisher>
    </journal-meta>
    <article-meta>
      <article-id pub-id-type="doi">DOI:10.12429/JZGCQY2662-4964-202510382</article-id>
      <article-id pub-id-type="publisher-id">15424</article-id>
      <title-group>
        <article-title>房建工程造价的全过程成本控制措施</article-title>
      </title-group>
      <contrib-group>
        <contrib contrib-type="author">
          <string-name>曾美凤</string-name>
        </contrib>
      </contrib-group>
      <pub-date pub-type="epub">
        <year>2025</year>
        <month>12</month>
      </pub-date>
      <issue>12</issue>
      <abstract>
        <p>本文聚焦房建工程造价的全过程成本控制措施开展研究，目的是提高房建项目的经济效益和管理水平。借助剖析房建工程造价
的构成及影响因素，研究设计、招标采购、施工、竣工验收及后期维护各阶段的成本控制方法，着重突出全过程的整体性管理。恰当的设
计方案选择、合理的招标采购管理、施工阶段的实时成本控制以及后期维护的持久管理为达成造价高效控制的核心。建议建立信息化管理
平台以及优化成本控制绩效评价机制，来推动成本控制的配合贯通和不断改善。本文的研究成果能给房建工程项目管理给予理论支持和实
践指导，促进行业良性进步。</p>
      </abstract>