<?xml version="1.0" encoding="UTF-8"?>
<!DOCTYPE article PUBLIC "-//NLM//DTD JATS (Z39.96) Article Authoring DTD v1.4 20240229//EN" "JATS-articleauthoring1.dtd">
<article article-type="research-article" xml:lang="zh-CN" xmlns:xlink="http://www.w3.org/1999/xlink">
  <front>
    <journal-meta>
      <journal-id journal-id-type="publisher-id">56</journal-id>
      <journal-title-group>
        <journal-title>建筑工程前沿</journal-title>
        <abbrev-journal-title>Frontiers of Construction Engineering</abbrev-journal-title>
      </journal-title-group>
      <issn>ISSN: 3104-817X EISSN: 3104-8161</issn>
      <publisher>
        <publisher-name>睿核出版社有限公司</publisher-name>
      </publisher>
    </journal-meta>
    <article-meta>
      <article-id pub-id-type="doi">DOI:10.12429/JZGCQY2662-4964-202610445</article-id>
      <article-id pub-id-type="publisher-id">16195</article-id>
      <title-group>
        <article-title>数据驱动的危大工程安全评价体系构建与智能预警模型研究</article-title>
      </title-group>
      <contrib-group>
        <contrib contrib-type="author">
          <string-name>刘方方</string-name>
        </contrib>
        <contrib contrib-type="author">
          <string-name>邵壮</string-name>
        </contrib>
        <contrib contrib-type="author">
          <string-name>周冰洋</string-name>
        </contrib>
      </contrib-group>
      <pub-date pub-type="epub">
        <year>2026</year>
        <month>1</month>
      </pub-date>
      <issue>1</issue>
      <abstract>
        <p>危大工程涉及深基坑、高支模、起重吊装等诸多高风险建设场景，且这些工程的风险隐蔽性强，事故后果严重，而现有的安全评价方法主要依靠经验判断和静态验证，很难适应风险的动态演变。且以往的评价方式也存在理论支撑薄弱、预警逻辑滞后的问题。因此，相关工作人员需要针对危大工程风险控制的关键问题，建立风险评价指标和智能预警方法，切实弥补动态风险定量和超前预测理论上的不足，形成基于风险的全过程控制理论，促进建筑施工安全评价工作向精准化、智能化方向升级。</p>