<?xml version="1.0" encoding="UTF-8"?>
<!DOCTYPE article PUBLIC "-//NLM//DTD JATS (Z39.96) Article Authoring DTD v1.4 20240229//EN" "JATS-articleauthoring1.dtd">
<article article-type="research-article" xml:lang="zh-CN" xmlns:xlink="http://www.w3.org/1999/xlink">
  <front>
    <journal-meta>
      <journal-id journal-id-type="publisher-id">58</journal-id>
      <journal-title-group>
        <journal-title>施工技术研究</journal-title>
        <abbrev-journal-title>Research on Construction Technology</abbrev-journal-title>
      </journal-title-group>
      <issn>ISSN: 3104-8129 EISSN: 3104-8137</issn>
      <publisher>
        <publisher-name>睿核出版社有限公司</publisher-name>
      </publisher>
    </journal-meta>
    <article-meta>
      <article-id pub-id-type="doi">10.65700/RHSGJSYJ01-2511-8129-0279</article-id>
      <article-id pub-id-type="publisher-id">15230</article-id>
      <title-group>
        <article-title>电力工程施工现场综合管理策略研究——以安全、进度、质量为核心</article-title>
      </title-group>
      <contrib-group>
        <contrib contrib-type="author">
          <string-name>刘再貌</string-name>
        </contrib>
      </contrib-group>
      <pub-date pub-type="epub">
        <year>2025</year>
        <month>12</month>
      </pub-date>
      <issue>12</issue>
      <abstract>
        <p>本文聚焦于电力工程施工现场综合管理，以安全、进度、质量为核心展开研究。通过分析电力工程施工现场管理现状，指出当
前存在的安全管理不到位、进度控制不严格、质量管理不规范等问题。针对这些问题，提出了一系列综合管理策略，包括加强安全管理体
系建设、优化进度控制与管理、严格质量管理体系等。同时，阐述了各策略的具体实施措施，如制定安全管理制度、制定合理的施工进度
计划、建立质量责任制等。通过实际案例分析，验证了所提策略的有效性。研究表明，实施这些综合管理策略能够显著提高电力工程施工
现场的安全水平、进度控制能力和质量管理效果，为电力工程的顺利实施提供有力保障。</p>