<?xml version="1.0" encoding="UTF-8"?>
<!DOCTYPE article PUBLIC "-//NLM//DTD JATS (Z39.96) Article Authoring DTD v1.4 20240229//EN" "JATS-articleauthoring1.dtd">
<article article-type="research-article" xml:lang="zh-CN" xmlns:xlink="http://www.w3.org/1999/xlink">
  <front>
    <journal-meta>
      <journal-id journal-id-type="publisher-id">58</journal-id>
      <journal-title-group>
        <journal-title>施工技术研究</journal-title>
        <abbrev-journal-title>Research on Construction Technology</abbrev-journal-title>
      </journal-title-group>
      <issn>ISSN: 3104-8129 EISSN: 3104-8137</issn>
      <publisher>
        <publisher-name>睿核出版社有限公司</publisher-name>
      </publisher>
    </journal-meta>
    <article-meta>
      <article-id pub-id-type="doi">10.65700/RHSGJSYJ01-2511-8129-0319</article-id>
      <article-id pub-id-type="publisher-id">15300</article-id>
      <title-group>
        <article-title>施工进度管理中的常见问题及优化策略</article-title>
      </title-group>
      <contrib-group>
        <contrib contrib-type="author">
          <string-name>倪萍伟</string-name>
        </contrib>
      </contrib-group>
      <pub-date pub-type="epub">
        <year>2025</year>
        <month>9</month>
      </pub-date>
      <issue>9</issue>
      <abstract>
        <p>施工进度管理是工程项目成功的关键核心，直接影响成本控制与交付质量。本文揭示四大核心问题：计划编制脱离实际，忽视
技术逻辑与风险缓冲机制；资源动态调度失衡，表现为人力错配、供应链断裂及资金滞后；多方协同机制缺失，根源在于本位主义与信息
孤岛；进度监控纠偏乏力，源于数据采集粗放与预警响应迟钝。针对性提出优化策略：科学编制弹性进度计划，融合关键路径法与关键链
理论，预留动态缓冲；实施资源智能调度，构建数字孪生资源池并推行供应商管理库存模式；建立协同治理平台，明确责任矩阵与闭环沟
通机制；完善实时监控体系，应用赢得值管理技术实现偏差量化预警。研究表明，系统性整合动态化与精细化管控手段，可显著提升进度
管理的预见性与可控性，为工程高效交付提供理论支撑与实践路径。</p>
      </abstract>