        <journal-title>施工技术研究</journal-title>
        <abbrev-journal-title>Research on Construction Technology</abbrev-journal-title>
      </journal-title-group>
      <issn>ISSN: 3104-8129 EISSN: 3104-8137</issn>
      <publisher>
        <publisher-name>睿核出版社有限公司</publisher-name>
      </publisher>
    </journal-meta>
    <article-meta>
      <article-id pub-id-type="doi">10.65700/RHSGJSYJ01-2611-8129-0411</article-id>
      <article-id pub-id-type="publisher-id">16409</article-id>
      <title-group>
        <article-title>EPC 模式下工程项目全过程成本管控路径研究</article-title>
      </title-group>
      <contrib-group>
        <contrib contrib-type="author">
          <string-name>李宏胜 刘涛</string-name>
        </contrib>
      </contrib-group>
      <pub-date pub-type="epub">
        <year>2026</year>
        <month>2</month>
      </pub-date>
      <issue>2</issue>
      <abstract>
        <p>EPC 工程项目要想实现有效管控，不仅对项目过程中的投标阶段、设计阶段、采购阶段、施工阶段、竣工阶段等提出挑战，也
对成本管理工作从深度、广度两方面提出更高的要求。在 EPC 模式下，从决策、设计、采购、施工、结算等环节入手，深入解析 EPC 工
程项目的成本控制难点，建立“前端决策-中端控制-后端回顾”的全过程控制机制，创新将限额设计等方法相融合，并以工程实例进行实证
检验，并给出针对性的优化方案。本项目研究将有助于解决工程成本管控脱节和风险传递失控的问题，提高工程成本管理水平。</p>