<?xml version="1.0" encoding="UTF-8"?>
<!DOCTYPE article PUBLIC "-//NLM//DTD JATS (Z39.96) Article Authoring DTD v1.4 20240229//EN" "JATS-articleauthoring1.dtd">
<article article-type="research-article" xml:lang="zh-CN" xmlns:xlink="http://www.w3.org/1999/xlink">
  <front>
    <journal-meta>
      <journal-id journal-id-type="publisher-id">58</journal-id>
      <journal-title-group>
        <journal-title>施工技术研究</journal-title>
        <abbrev-journal-title>Research on Construction Technology</abbrev-journal-title>
      </journal-title-group>
      <issn>ISSN: 3104-8129 EISSN: 3104-8137</issn>
      <publisher>
        <publisher-name>睿核出版社有限公司</publisher-name>
      </publisher>
    </journal-meta>
    <article-meta>
      <article-id pub-id-type="doi">10.65700/RHSGJSYJ01-2611-8129-0412</article-id>
      <article-id pub-id-type="publisher-id">16410</article-id>
      <title-group>
        <article-title>EPC 总承包模式下工程质量精细化管理研究</article-title>
      </title-group>
      <contrib-group>
        <contrib contrib-type="author">
          <string-name>刘志海 刘涛</string-name>
        </contrib>
      </contrib-group>
      <pub-date pub-type="epub">
        <year>2026</year>
        <month>2</month>
      </pub-date>
      <issue>2</issue>
      <abstract>
        <p>采用 EPC 总承包模式，将设计、采购和施工三个环节置于单一的合约结构中，以实现项目管理的一体化，提高项目施工的总体
效益。但是，通过对工程项目实施过程的分析，发现该方法虽然解决了工程项目中存在的设计施工衔接断层的问题，但也带来一些新的管
理问题。由于对设计图的可施工性审查不严，分包层级过多，质量标准被稀释，过程检查节点覆盖率不够，这些因素都会在体系内部潜藏，
直到完工验收时才会全部显现出来。而“精细经营”概念的提出，则为解决这一难题提供一种方法论指导。</p>
      </abstract>