<?xml version="1.0" encoding="UTF-8"?>
<!DOCTYPE article PUBLIC "-//NLM//DTD JATS (Z39.96) Article Authoring DTD v1.4 20240229//EN" "JATS-articleauthoring1.dtd">
<article article-type="research-article" xml:lang="zh-CN" xmlns:xlink="http://www.w3.org/1999/xlink">
  <front>
    <journal-meta>
      <journal-id journal-id-type="publisher-id">58</journal-id>
      <journal-title-group>
        <journal-title>施工技术研究</journal-title>
        <abbrev-journal-title>Research on Construction Technology</abbrev-journal-title>
      </journal-title-group>
      <issn>ISSN: 3104-8129 EISSN: 3104-8137</issn>
      <publisher>
        <publisher-name>睿核出版社有限公司</publisher-name>
      </publisher>
    </journal-meta>
    <article-meta>
      <article-id pub-id-type="doi">10.65700/RHSGJSYJ01-2611-8129-0414</article-id>
      <article-id pub-id-type="publisher-id">16412</article-id>
      <title-group>
        <article-title>城市高架全预制装配立柱盖梁高精度控制施工技术</article-title>
      </title-group>
      <contrib-group>
        <contrib contrib-type="author">
          <string-name>陆飞虎</string-name>
        </contrib>
      </contrib-group>
      <pub-date pub-type="epub">
        <year>2026</year>
        <month>2</month>
      </pub-date>
      <issue>2</issue>
      <abstract>
        <p>本文以现有 S3 公路 4 标段工程，就全预制装配式桥梁施工里承台预埋钢筋和预制构件套筒毫米级对接、多节段盖梁拼装线形把
控等技术难题，系统说明从承台预埋定位至立柱盖梁安装的全流程精度控制技术｡ 着重说明定型定位架于承台预埋钢筋精度把控里的运用、
根据定位框架与千斤顶微调的立柱垂直度调控办法、短线匹配法预制多柱式盖梁的组装工艺，还有全套筒灌浆施工的核心技术要点｡ 经由
S3 公路 4 标段的工程实践，证实该技术体系的有效性，为类似城市高架预制装配施工提供参考｡</p>