<?xml version="1.0" encoding="UTF-8"?>
<!DOCTYPE article PUBLIC "-//NLM//DTD JATS (Z39.96) Article Authoring DTD v1.4 20240229//EN" "JATS-articleauthoring1.dtd">
<article article-type="research-article" xml:lang="zh-CN" xmlns:xlink="http://www.w3.org/1999/xlink">
  <front>
    <journal-meta>
      <journal-id journal-id-type="publisher-id">58</journal-id>
      <journal-title-group>
        <journal-title>施工技术研究</journal-title>
        <abbrev-journal-title>Research on Construction Technology</abbrev-journal-title>
      </journal-title-group>
      <issn>ISSN: 3104-8129 EISSN: 3104-8137</issn>
      <publisher>
        <publisher-name>睿核出版社有限公司</publisher-name>
      </publisher>
    </journal-meta>
    <article-meta>
      <article-id pub-id-type="doi">10.65700/RHSGJSYJ01-2611-8129-0418</article-id>
      <article-id pub-id-type="publisher-id">16416</article-id>
      <title-group>
        <article-title>复杂环境下的新旧地下连通道衔接综合施工技术研究</article-title>
      </title-group>
      <contrib-group>
        <contrib contrib-type="author">
          <string-name>丁志营</string-name>
        </contrib>
      </contrib-group>
      <pub-date pub-type="epub">
        <year>2026</year>
        <month>2</month>
      </pub-date>
      <issue>2</issue>
      <abstract>
        <p>在城市商业、办公综合体项目地下空间开发建设中，新建结构与既有结构的可靠衔接是施工的重点与难点。本文以上海市某大
型项目实例为背景，针对新旧连通道施工中普遍面临的新旧围护体系交界处止水、肥槽稳定、软土地质沉降控制，基坑开挖变形控制、施
工缝、变形缝接口防水等技术难点，开展综合技术分析研究。首先系统分析新旧地下连通道衔接施工中的重难点；其次，围绕重难点，从
新旧围护结构止水探查与肥槽预处理、软土地基沉降预防、地下连续墙开洞施工缝、变形缝止水、防水设防与有组织排水体系构建、开挖
支撑支护与变形控制等方面开展技术分析。通过实践结果表明，新旧连通道接口实现了可靠衔接，有效保证了连通道的正常使用，降低了
运营阶段的维护成本，可供类似工程借鉴。</p>