        <journal-title>施工技术研究</journal-title>
        <abbrev-journal-title>Research on Construction Technology</abbrev-journal-title>
      </journal-title-group>
      <issn>ISSN: 3104-8129 EISSN: 3104-8137</issn>
      <publisher>
        <publisher-name>睿核出版社有限公司</publisher-name>
      </publisher>
    </journal-meta>
    <article-meta>
      <article-id pub-id-type="doi">10.65700/RHSGJSYJ01-2611-8129-0429</article-id>
      <article-id pub-id-type="publisher-id">16428</article-id>
      <title-group>
        <article-title>基于新疆戈壁滩地区工程项目建设管理研究</article-title>
      </title-group>
      <contrib-group>
        <contrib contrib-type="author">
          <string-name>杨树雄</string-name>
        </contrib>
      </contrib-group>
      <pub-date pub-type="epub">
        <year>2026</year>
        <month>2</month>
      </pub-date>
      <issue>2</issue>
      <abstract>
        <p>新疆戈壁滩具有大风沙尘频发、极端温差显著、地域偏远闭塞、配套资源匮乏的典型特征，是国内工程建设管控难度极高的特
殊区域。本文以新疆哈密能源化工电仪实验楼 EPC 工程为实例，针对性提出适配戈壁工况的动态进度调控、物资运输保障、劳务队伍稳定、
设备运维防护、全过程风险防控的精细化施工管理体系。通过工程实践应用，有效解决了戈壁地区施工降效明显、资源保障滞后、安全隐
患多发、工期难以把控等突出问题，显著提升了项目施工建设质效与风险防控能力。研究成果可为新疆戈壁滩及同类偏远极端区域工程项
目的施工组织与建设管理提供可靠的实践参考与技术借鉴。</p>